JP Vodovod i Kanalizacija Zenica has been delivered three PK superstructures. The delivery includes two tipper bodies, one of which is equipped with a Palfinger crane, and one body with a cargo box and a Palfinger MBB tail lift. All superstructures are mounted on Iveco vehicles, with two units in a 4×4 configuration, which will […]